How to Create a BOM (Bill of Materials) in the Manufapp System​
Access Item Master:
Navigate to the Item Master section.
Select the item for which you want to create the BOM.
(Example: FG135)
Add BOM:
Click on Add BOM for the selected item.
Define WIP Items:
Specify the WIP (Work in Progress) items that will be used to produce the finished goods.
For example: WIP128 and WIP129 can be selected one by one.
After defining these WIP items, click on Submit to save them.
Add Raw Materials for WIP Items:
To create the WIP items, you’ll need raw materials. These should be added to the BOM along with their quantities.
For example:
To create WIP128, add:
Raw Material Item 123
Raw Material Item 125
Specify their required quantities.
Click Submit after entering this information.
Add Raw Materials for Additional WIP Items:
Similarly, for WIP129, add:
Raw Material Item 125
Raw Material Item 124
Enter their quantities and click Submit to save.
BOM Creation Complete:
You have now successfully created a BOM for a finished good item by linking it with its WIP items and the raw materials required to produce them.