Cycle Time Rules help define how long a process takes on a specific machine for a group of items.
They are essential for accurate planning, machine load calculation, and overall production efficiency.
Navigate to:
Masters > Items
Search for the item you want to configure.
📌 Example: ITEM00018
Click on the item name to open its detail view.
On the item detail page, go to the Rules/Tools tab.
If no rules exist yet, you’ll see:
Rules not available
Tools not available
Click Add Rule to begin.
Fill in the following details in the popup:
Machine Group – e.g., SO MACHINE, CNC
Item Group Tag – e.g., SO_GROUP
Process – e.g., BORING, BROACHING
Seconds – Total time in seconds (e.g., 60 for 1 minute)
Click Submit to save.
You can always go back and edit the cycle time rule.
Click the ✏️ icon next to the rule, make your changes, and hit Submit again.
Once submitted, the rule appears in the list showing:
Machine
Item Group
Process
Value (Cycle Time)
Option to Link Tool
You’ve now added a cycle time rule. This ensures your operations run with accurate machine timings and helps ManufApp plan production more effectively.